modify readme
Change-Id: I28481e22a75efb7c4d620dd52365a5cf0c1b0dc5
This commit is contained in:
parent
ab51487878
commit
491c777f5d
22
README.md
22
README.md
@ -1,6 +1,16 @@
|
||||
## Overview
|
||||
|
||||
泛算调度,是CFN WG中的一个子组,其目标是以云原生技术为基础技术栈,实现中心云、边缘云、非云算力等多类算力的统一纳管、和统一感知,以及任务跨域调度,实现应用的协同调度、以及实时动态调整,构建泛算调度基础平台.
|
||||
|
||||
|
||||
## Description
|
||||
Goal:
|
||||
With cloud native technology as the basic technology stack, unified management and perception of central cloud, edge cloud, non-cloud computing power and other types of computing power are realized, as well as cross-domain task scheduling, collaborative scheduling and real-time dynamic adjustment of applications are realized, and the basic platform of universal computing scheduling is built.
|
||||
Main Functions:
|
||||
1. Strategy management and intelligent decision-making
|
||||
• Receive input of candidate computing node information for scheduling resource requirements or meeting resource requirements.
|
||||
• Output preferred network resource node information based on intelligent algorithms and historical data.
|
||||
• Responsible for the full life cycle management of scheduling policies.
|
||||
2. Computing power perception
|
||||
• Receive queries on the type, capacity and performance of resources and resource combinations required by choreography and scheduling, and feedback information of computing nodes that meet the requirements of resources and resource combinations.
|
||||
• Realize the perception and recording of metadata information such as the quantity, distribution and occupation of resource object information such as computing power, network and storage.
|
||||
• Realize real-time awareness of the status information of computing, network, storage, application, service and other objects, and provide awareness for intelligent decision making, computing scheduling, dynamic capacity expansion and shrinkage, and disaster recovery.
|
||||
3. Computational force scheduling
|
||||
• Based on the request of choreography parameters, component capabilities such as computing power enablement, network enablement, application enablement, data enablement and service enablement are invoked to complete collaborative scheduling at the edge of cloud network.
|
||||
• Based on application availability requirements, combine computing power perception module. and intelligent decision module to complete disaster recovery and automatic capacity expansion and shrinkage of computing power.
|
||||
4. API Gateway:
|
||||
• As a northbound interface, it provides a standard external interface for communication with modules such as network choreography.
|
||||
|
Loading…
Reference in New Issue
Block a user