Removed requirement that one of WG co-chairs is nominated and elected by the OIF Board.
1. There is no legal document in OpenStack that requires that. It was done intially to have a better rapport between the OpenStack board and Interop WG. 2. The Board member was useful to ramp up interop WG and get participation from vendors. We are at the different time in OpenStack maturity now. 3. The Board changed from OpenStack to Open Infrastructure with many non-openstack projects. So to have a board member on each OpenInfra project is not scalable. 4. Board trusts that 4 entities that are on Approval Committee adequetly represent Board view, since TC and Foundation staff for Marketplace are present. Change-Id: I9a045de3e1b93c471aebff8757a8bae9674c7c6f
This commit is contained in:
parent
491fad0b48
commit
7c16d452dd
@ -201,15 +201,11 @@ B4. For Gerrit reviews, Interop Working Group Co-Chairs act as
|
|||||||
party.
|
party.
|
||||||
3. Interop Working Group members may proxy change requests as
|
3. Interop Working Group members may proxy change requests as
|
||||||
long as the requesting party is explicitly acknowledged.
|
long as the requesting party is explicitly acknowledged.
|
||||||
4. One Interop Working Group Co-Chair must be an Open Infrastructure
|
4. All Interop Working Group Co-Chair will be elected by the
|
||||||
Foundation Board member.
|
|
||||||
5. One Co-Chair of Interop Working Group is nominated by
|
|
||||||
the Open Infrastructure Board of Directors.
|
|
||||||
6. One Interop Working Group Co-Chair will be elected by the
|
|
||||||
Interop Working Group. Election quorum is composed of
|
Interop Working Group. Election quorum is composed of
|
||||||
attendees present during the election meeting.
|
attendees present during the election meeting.
|
||||||
7. Additional core reviewers (+2) can be appointed by Co-Chairs.
|
5. Additional core reviewers (+2) can be appointed by Co-Chairs.
|
||||||
8. Election meetings must be posted at least one meeting prior.
|
6. Election meetings must be posted at least one meeting prior.
|
||||||
|
|
||||||
B5. Projects Interlocks
|
B5. Projects Interlocks
|
||||||
1. For the PTG, the Interop Working Group requests a meeting
|
1. For the PTG, the Interop Working Group requests a meeting
|
||||||
|
Loading…
Reference in New Issue
Block a user