diff --git a/process/2015A.rst b/process/2015A.rst index c6cbf363..2126ecbc 100644 --- a/process/2015A.rst +++ b/process/2015A.rst @@ -207,6 +207,18 @@ C3. Vendor Grievance Process 3. The DefCore committee will acknowledge vendor requests to flag tests within 30 days. 4. Vendors may not request flagging all tests in a capability. + 5. Tests marked for flagging must include: + a. A reason for the flag, which may include but is not limited to + a capability not being widely supported or an existing bug + in the test. + b. A remediation step to remove the flag. Options include removing + the test from the next release, fixing an existing feature in + upstream code, or fixing the bug in the test suite. + c. A date of test flagging to give guidance to the committee for + future test removal. + 6. Vendors must make a good-faith effort to document the reason for + flagging, and where possible attempt to fix upstream bugs in test + or production code before submitting tests for flagging. C4. Results of Vendor Self-Tests will be open