023334dfcb
bump up the max_files to 32768 and max_processes to 131072. when nova used ceph as backend, the default limit 1024 is not enough. each connection from rbd image to osd needs 1 fd and 2 threads. if we have 200 osds, we need 200 fds and 400 threads for 1 image. Change-Id: I94c3ec111473ea2ccacdea5dbbf3fdc9c569859f |
||
---|---|---|
.. | ||
notes | ||
source |