controller-0 unavailable after upgrading and unlocking (r7,r6,dsR7,dsR6)

Add note before standard and duplex procedure

Signed-off-by: Ron Stone <ronald.stone@windriver.com>
Change-Id: I0798386325d010f600b2c130ba0532966d77763c
This commit is contained in:
Ron Stone 2023-01-25 08:30:25 -05:00 committed by Juanita-Balaraj
parent d5b289b43f
commit 076c59b6fe

View File

@ -46,8 +46,14 @@ of |prod| software.
cannot if there are locked nodes.
.. note::
The upgrade procedure includes steps to resolve system health issues.
.. note::
Upgrading hosts should be completed within 24 hours to avoid a kubeadm token
timeout.
.. rubric:: |proc|
#. Ensure that controller-0 is the active controller.