Replaced Figure in "Redundant Top-of-Rack Switch Deployment Considerations"
Updated Patchset 1 comments Signed-off-by: Juanita-Balaraj <juanita.balaraj@windriver.com> Change-Id: I4fa551b9133e4c0ef21719323bacba3cfdee1373
This commit is contained in:
parent
b8631d62e8
commit
41cf08b09d
@ -23,7 +23,7 @@ switches are normally active, providing full bandwidth to the |LAG|. If there
|
||||
are multiple failed links on both switches, at least one connection in each
|
||||
aggregate pair is still functional. If one switch fails, the other continues to
|
||||
provide connections for all |LAG| links that are operational on that switch.
|
||||
For more about configuring |VPC|, refer to your switch documentation.
|
||||
For more information about configuring |VPC|, refer to your switch documentation.
|
||||
|
||||
You can use an active/standby failover model for the switches, but at a cost to
|
||||
overall reliability. If there are multiple failed links on both switches, then
|
||||
|
Binary file not shown.
Before Width: | Height: | Size: 9.2 KiB After Width: | Height: | Size: 28 KiB |
Loading…
Reference in New Issue
Block a user