This change addresses a long-standing issue in rST documentation imported from XML. That import process added backslash escapes in front of various characters. The three most common being '(', ')', and '_'. These instances are removed. Signed-off-by: Ron Stone <ronald.stone@windriver.com> Change-Id: Id43a9337ffcd505ccbdf072d7b29afdb5d2c997e
1.1 KiB
1.1 KiB
Overview of Upgrade Abort Procedure
You can abort an upgrade procedure if necessary.
There are two cases for aborting an upgrade:
- Before controller-0 has been upgraded (that is, only controller-1 has been upgraded): In this case the upgrade can be aborted and the system will remain in service during the abort.
- After controller-0 has been upgraded (that is, both controllers have been upgraded): In this case the upgrade can only be aborted with a complete outage and a re-install of all hosts. This would only be done as a last resort, if there was absolutely no other way to recover the system.
Rolling Back a Software Upgrade Before the Second Controller Upgrade <rolling-back-a-software-upgrade-before-the-second-controller-upgrade>
Rolling Back a Software Upgrade After the Second Controller Upgrade <rolling-back-a-software-upgrade-after-the-second-controller-upgrade>