f125a8b892
This change addresses a long-standing issue in rST documentation imported from XML. That import process added backslash escapes in front of various characters. The three most common being '(', ')', and '_'. These instances are removed. Signed-off-by: Ron Stone <ronald.stone@windriver.com> Change-Id: Id43a9337ffcd505ccbdf072d7b29afdb5d2c997e
185 lines
6.7 KiB
ReStructuredText
185 lines
6.7 KiB
ReStructuredText
|
|
.. sab1593196680415
|
|
.. _performing-an-orchestrated-upgrade:
|
|
|
|
===============================
|
|
Perform an Orchestrated Upgrade
|
|
===============================
|
|
|
|
You can perform a partially orchestrated Upgrade of a |prod| system using the
|
|
CLI and Horizon Web interface. Upgrade and stability of the initial controller
|
|
node must be done manually before using upgrade orchestration to orchestrate the
|
|
remaining nodes of the |prod|.
|
|
|
|
.. rubric:: |context|
|
|
|
|
.. note::
|
|
Management-affecting alarms cannot be ignored at the indicated severity
|
|
level or higher by using relaxed alarm rules during an orchestrated upgrade
|
|
operation. For a list of management-affecting alarms, see |fault-doc|:
|
|
:ref:`alarm-messages-overview-19c242d3d151`. To display
|
|
management-affecting active alarms, use the following command:
|
|
|
|
.. code-block:: none
|
|
|
|
~(keystone_admin)]$ fm alarm-list --mgmt_affecting
|
|
|
|
During an orchestrated upgrade, the following alarms are ignored even when
|
|
strict restrictions are selected:
|
|
|
|
- 750.006, Generic alarm for any platform-managed applications as they are auto-applied
|
|
|
|
- 900.005, Upgrade in progress
|
|
|
|
- 900.201, Software upgrade auto apply in progress
|
|
|
|
.. _performing-an-orchestrated-upgrade-ul-qhy-q1p-v1b:
|
|
|
|
.. rubric:: |prereq|
|
|
|
|
See :ref:`Upgrading All-in-One Duplex / Standard
|
|
<upgrading-all-in-one-duplex-or-standard>`, and perform Steps 1-8, to manually
|
|
upgrade the initial controller node before doing the upgrade orchestration
|
|
described below to upgrade the remaining nodes of the |prod| system.
|
|
|
|
.. rubric:: |proc|
|
|
|
|
.. _performing-an-orchestrated-upgrade-steps-e45-kh5-sy:
|
|
|
|
#. Select **Platform** \> **Software Management**, then select the **Upgrade
|
|
Orchestration** tab.
|
|
|
|
#. Click the **Create Strategy** button.
|
|
|
|
The **Create Strategy** dialog appears.
|
|
|
|
#. Create an upgrade strategy by specifying settings for the parameters in the
|
|
**Create Strategy** dialog box.
|
|
|
|
Create an upgrade strategy, specifying the following parameters:
|
|
|
|
- storage-apply-type:
|
|
|
|
``serial`` (default)
|
|
Storage hosts will be upgraded one at a time.
|
|
|
|
``parallel``
|
|
Storage hosts will be upgraded in parallel, ensuring that only one
|
|
storage node in each replication group is upgraded at a time.
|
|
|
|
``ignore``
|
|
Storage hosts will not be upgraded.
|
|
|
|
- worker-apply-type:
|
|
|
|
``serial`` (default):
|
|
Worker hosts will be upgraded one at a time.
|
|
|
|
``parallel``
|
|
Worker hosts will be upgraded in parallel, ensuring that:
|
|
|
|
- At most max-parallel-worker-hosts (see below) worker hosts
|
|
will be upgraded at the same time.
|
|
|
|
- At most half of the hosts in a host aggregate will be upgraded
|
|
at the same time.
|
|
|
|
- Worker hosts with no application pods are upgraded before
|
|
worker hosts with application pods.
|
|
|
|
``ignore``
|
|
Worker hosts will not be upgraded.
|
|
|
|
``max-parallel-worker-hosts``
|
|
Specify the maximum worker hosts to upgrade in parallel (minimum:
|
|
2, maximum: 10).
|
|
|
|
.. note::
|
|
For a maximum worker hosts condition in a Standard configuration
|
|
(50), the value shall be at the maximum 2, which represents the
|
|
minimum value.
|
|
|
|
``alarm-restrictions``
|
|
This option lets you specify how upgrade orchestration behaves when
|
|
alarms are present.
|
|
|
|
You can use the CLI command :command:`fm alarm-list
|
|
--mgmt_affecting` to view the alarms that are management affecting.
|
|
|
|
``Strict``
|
|
The default strict option will result in upgrade orchestration
|
|
failing if there are any alarms present in the system (except
|
|
for a small list of alarms).
|
|
|
|
``Relaxed``
|
|
This option allows orchestration to proceed if alarms are
|
|
present, as long as none of these alarms are management
|
|
affecting.
|
|
|
|
#. Click **Create Strategy** to save the upgrade orchestration strategy.
|
|
|
|
The upgrade strategy consists of one or more stages, which consist of one
|
|
or more hosts to be upgraded at the same time. Each stage will be split
|
|
into steps (for example, query-alarms, lock-hosts, upgrade-hosts).
|
|
Following are some notes about stages:
|
|
|
|
- Controller-0 is upgraded first, followed by storage hosts and then
|
|
worker hosts.
|
|
|
|
- Worker hosts with no application pods are upgraded before worker hosts
|
|
with application pods.
|
|
|
|
- Pods will be moved off each worker host before it is upgraded.
|
|
|
|
- The final step in each stage is one of:
|
|
|
|
**system-stabilize**
|
|
This waits for a period of time (up to several minutes) and
|
|
ensures that the system is free of alarms. This ensures that we do
|
|
not continue to upgrade more hosts if the upgrade has caused an
|
|
issue resulting in an alarm.
|
|
|
|
**wait-data-sync**
|
|
This waits for a period of time (up to many hours) and ensures
|
|
that data synchronization has completed after the upgrade of a
|
|
controller or storage node.
|
|
|
|
Examine the upgrade strategy. Pay careful attention to:
|
|
|
|
- The sets of hosts that will be upgraded together in each stage.
|
|
|
|
- The sets of pods that will be impacted in each stage.
|
|
|
|
.. note::
|
|
It is likely that as each stage is applied, application pods will
|
|
be relocated to worker hosts that have not yet been upgraded. That
|
|
means that later stages will be migrating more pods than those
|
|
originally listed in the upgrade strategy. The upgrade strategy is
|
|
NOT updated, but any additional pods on each worker host will be
|
|
relocated before it is upgraded.
|
|
|
|
#. Apply the upgrade strategy. You can optionally apply a single stage at a
|
|
time.
|
|
|
|
While an upgrade strategy is being applied, it can be aborted. This results
|
|
in:
|
|
|
|
- The current step will be allowed to complete.
|
|
|
|
- If necessary an abort phase will be created and applied, which will
|
|
attempt to unlock any hosts that were locked.
|
|
|
|
After an upgrade strategy has been applied (or aborted) it must be
|
|
deleted before another upgrade strategy can be created. If an
|
|
upgrade strategy application fails, you must address the issue that caused
|
|
the failure, then delete/re-create the strategy before attempting to apply
|
|
it again.
|
|
|
|
For more information, see: :ref:`Perform an Orchestrated Upgrade Using the CLI <performing-an-orchestrated-upgrade-using-the-cli>`
|
|
|
|
.. only:: partner
|
|
|
|
.. include:: /_includes/performing-an-orchestrated-upgrade.rest
|
|
:start-after: Orchupgrade-begin
|
|
:end-before: Orchupgrade-end
|